1. Home
  2. Projects
Projects

Projects

Documented case studies with numeric outcomes, followed by the full track record of engagements since 2023.

01 / Case studies

Case studies

02 / Track record

Track record

Selected completed and ongoing engagements — 2023 to present.

Track record
YearClientCategoryScopeLocation
2023–2024Expro Eurasia LimitedMonitoringReservoir monitoring — quartz memory gauges and SSV rental for EPC project. 10 quartz memory pressure gauges + SSVRozhkovskoye field, Uralsk
2023–2024Samga Petroleum LLPSupplySupply and installation of 4 downhole production monitoring systems under ESP. PLT instruments + ESP flowmeter gaugesAktobe
2023KEN-SARY LLPSupplySupply of 30 slotted downhole filters 2 7/8"Aktau, Mangistau region
2024–2026KazGerMunai Joint Venture LLPSupplySupply of 75 downhole pressure-temperature gauges (25 units/year) for monitoring well conditions. Client later reduced volume to 50 unitsKyzylorda region
2025Urikhtau Operating LLPBoostFlowBoostFlow — multiphase pump operation during well testing at Urikhtau. Gas-oil mix transferred to production line, significantly reducing flaring. Included PTA and fluid analysis Case study →West Kazakhstan
2025–2027Expert Optima LLPMonitoringReservoir pressure monitoring and well interference analysis — Rozhkovskoye field. Quartz gauges on producing wells; hydraulic connectivity mapping; data for field development planningWest Kazakhstan
2025–2026Undisclosed operatorBoostFlowBoostFlow multiphase pumping — 3 manifold campaigns. LP header pressure reduction; zero incidentsMiddle East
2026–2027NC JSC KazMunayGasEngineeringCondensate stabilisation system — process design and modelling, equipment supply and setup, monitoring. HP/LP separation, condensate stabilisationWest Kazakhstan

A similar challenge?

Describe the well, manifold or field and we will propose a scope.

Contact us